HomeAboutServicesProjectsArticlesContact

Image coming soon!

CPS Engineering, Inc. Mechanical and Electrical Engineers

Projects

IT Room Upgrades

A reliable conditioned environment is the lifeblood of a modern data-processing operation. Good maintenance is paramount, but building in redundancy so that equipment can be serviced without a loss of cooling is also essential. Furthermore, very early detection of smoke in the airstream is considered the best way to prevent a fire problem from escalating.

CPS Engineering upgraded an existing data center with all of these goals in mind. The computer room air-conditioning units shown in this picture are tied together using a common plenum and isolating dampers. The equipment is state-of-the-art, and an aspiration smoke detection system is added, all to provide the Owner with a highly efficient and reliable installation.

Previous | Next


Home | About | Services | Projects | Articles | Contact | Site map
CPS Engineering  90 National Drive  Glastonbury, CT 06033 
Tel. (860) 657-8118  Fax (860) 657-8999  info@cpsengineering.com